How do you get an electrical permit in Seattle?

  1. Research. Determine permitting and plan review requirements.
  2. Submit Application. First, determine if your project requires plan review.
  3. Get Permit. Pay final fees.
  4. Schedule Inspections. The contractor or installer is responsible for scheduling each inspection online or by calling (206) 684-8950 before the permit expires.

How do I check my permit in Seattle?

Check jurisdiction online, call the Records Center at 206-296-6600 or email [email protected]. In most cases, Records Center staff can retrieve the permit file(s) you are looking for while you wait.

Do I need an electrical permit Seattle?

Do I need an electrical permit? You need to get a permit for all electrical work, with a few excep- tions. The Seattle Electrical Code, 80.50 (B) itemizes the few items which can be replaced without a permit (for example, dimmers, thermostats, water heater, and baseboard heater).

Does the city of Seattle issue certificate of occupancy?

The Certificate of Occupancy is a document issued by the Seattle Department of Construction and Inspections (SDCI), previously the Department of Planning and Development (DPD). The C of O also contains information about the occupancy load.

What do I need an electrical permit for?

An electrical permit is required when you: y Install or alter any permanent wiring or electrical device. y Run additional wiring in your home. y Install a new electrical outlet or light fixture.

Can I do my own electrical work in Seattle?

Yes, if you perform your own work. If you’re not doing the work, you must hire an electrical contractor. If you get a homeowner permit and then decide to hire someone, you can add (or delete) a contractor as needed (to do so, contact [email protected] or your inspector).

Do I need a permit to build a patio cover in Washington state?

Yes, Construction of a cover over a deck or patio requires a building permit and must meet setbacks. Shade structures or arbors where the roof is not solid may be exempt from a building permit but must still meet setbacks.

Where can I get building plans in Seattle?

You can access their website at: http://www.seattle.gov/sdci or call (206) 684-8600. For properties in other incorporated municipalities, please check with the clerk of that city/town. Some King County Assessor’s Property Record Cards may include a sketch of the exterior building plan for residential structures.

Can a homeowner pull a permit for electrical work?

A homeowner can pull a permit for just about any situation. Even if not licensed, homeowners may pull electrical, plumbing, and HVAC permits (MEPs). The permit holder, in this case the homeowner, is responsible for calling inspections and ultimately responsible for all work performed under the permit.

Can a homeowner do their own electrical work?

DIY (do it yourself) electrical work is dangerous and illegal. You may think you can save money by installing an electrical appliance yourself. But, doing electrical work yourself can: put you, your household or tenants at risk of injury or death.

What electrical work are you allowed to do yourself?

Replacements, Minor Repairs and ‘Like for Like’ Changes – These are the main electrical jobs that you’ll be allowed to undertake yourself. So, you might want to change and/or move sockets, ceiling lights or light switches. You can even look to change any wires that might look old or damaged.

What do I need to get an electrical permit in Seattle?

Any professional applying for electrical permits must have a Washington State electrical contractor’s license and a Seattle business license. Property owners may do their own work when they own and occupy the property they’re working on. Some projects require plan review and are not issued the same day.

How to schedule an electrical inspection in Seattle?

The contractor or installer is responsible for scheduling each inspection online or by calling (206) 684-8950 before the permit expires. You must have your permit number available when you call for an inspection. Most permits require three electrical inspections: cover, service, and final.

How long does it take to renew a building permit in Seattle?

The renewal or reestablishment of development permits and/or separate mechanical permits is one-and-a-half times our hourly fee. How Long Does it Take? We try to issue renewal or reestablishment permits within 48 hours after you apply. Apply for all renewals and reestablishments online at the Seattle Services Portal.

How to search Seattle Department of construction and inspections?

SEATTLE DEPARTMENT OF CONSTRUCTION & INSPECTIONS Permit and Property Records Help Search by Record Number Record #(eg, Permit, License, Case, Building): Enter a numberRecord # must be at least 7 characters Search by Address Street address within Seattle: SEATTLE DEPARTMENT OF CONSTRUCTION & INSPECTIONS