How do I get a building permit in Seattle?

2. Start Permit Application

  1. Start your application. Complete the Building & Land Use Pre-Application online using the Seattle Services Portal.
  2. Request a pre-application site visit.
  3. Request a pre-submittal conference (optional).
  4. Apply for exemptions.
  5. Prepare your plans.
  6. Fill out forms.
  7. Coordinate with other agencies.

How long does it take to get a building permit in Seattle?

Even once the City of Seattle has your project for review, you are not out of the woods. After your intake date, the city will take anywhere from two to eight weeks to do the initial review of your permit drawings.

Do I need a permit to build a deck in Seattle?

You need a permit to build a deck if it is: More than 18 inches above the ground. A roof deck (built on top of part of the building) In an environmentally critical area (ECA), for example landslide-prone areas.

What requires a building permit in Washington state?

However you will normally need a permit to construct, alter, enlarge, or demolish any structure. This includes remodeling and renovations, as well as accessory structures. Depending on your local regulations, you may need to get a permit to build a fence or detached garage.

What is permit value?

Permit Value means a calculation of the total value of any form of construction that is to be submitted by the owner to the satisfaction of the Manager of Building and Inspections.

Do I need a permit to build a shed in Washington state?

What Permits Do You Need? You don’t need a permit to build a shed if it meets all of these criteria: The total area (or “footprint”) of the shed’s roof is 120 square feet or less. The shed is a single-story building.

How much does a building permit cost in Washington?

The State of Washington charges $6.50 on every building permit issued. Example: If the valuation of the project is $2,000, the permit fee will be $184.50.

How high can a fence be Seattle?

Research the Code In single-family zones, your fence height is limited to 6 feet, with an additional 2 feet of architectural features such as trellises. On a sloping site, your fence can be 8 feet high, if the average height between posts is 6 feet.

How close can you build to property line Seattle?

Seattle is fairly flexible about where you can put a small shed structure, allowing them in the front, side, or rear yard. You are, however, subject to the same setbacks as garages: 20 feet from the front property line, 5 feet of the side property line.

How big of a shed can I build without a permit in Washington state?

You don’t need a permit to build a shed if it meets all of these criteria: The total area (or “footprint”) of the shed’s roof is 120 square feet or less. The shed is a single-story building. The shed sits on a simple concrete slab, pier blocks, or soil.

How much does a building permit cost in Washington state?

How to find a building permit in Seattle?

Search by Record Number Record #(eg, Permit, License, Case, Building): Enter a numberRecord # must be at least 7 characters Search by Address Street address within Seattle: SEATTLE DEPARTMENT OF CONSTRUCTION & INSPECTIONS 700 5th Ave. Suite 2000 P.O. Box 34019 Seattle, WA P:(206) 684-8600 Permits Codes & Rules Tools & Resources

Where is the Seattle Department of construction and inspections?

Search by Address Street address within Seattle: SEATTLE DEPARTMENT OF CONSTRUCTION & INSPECTIONS 700 5th Ave. Suite 2000 P.O. Box 34019 Seattle, WA P:(206) 684-8600 Permits Codes & Rules Tools & Resources

When does construction on the Seattle waterfront start?

New traffic and transit lanes will open on Alaskan Way between S. King and Union streets in fall 2021. Construction of the park promenade, a landscaped walking space along the water and piers, and bike path, between the park promenade and road, is anticipated to begin in late 2021.

What kind of work does waterfront construction do?

We specialize in the construction of piers and docks, floats, bulkheads, pile driving, barges and dock accessories for both private and commercial water construction. Backed by a full-service fabrication team and highly-skilled permit department, Waterfront Construction understands what it takes to get the job done while honoring natural habitats.